9001cc金沙以诚为本

400-700-9998
9001cc金沙以诚为本(中国)有限公司官网Enquiry:hkmarketing@epc.com.hk 9001cc金沙以诚为本(中国)有限公司官网Whatsapp Enquiry: +85261990717
Buy
EPC Geotechnical and Structural
Geotechnical and Structural
Monitoring deformation around a simulated repository tunnel
Add Time:2018-11-23 View Count:2462 Resoure:EPC
Image Monitoring deformation around a simulated repository tunnel
 
Full-scale heater experiment in a clay-rich formation (Opalinus Clay)




Aim of monitoring:

The aim of the FE experiment is to investigate repository-induced thermo-hydro-mechanical coupled effects on the host rock.




Main results:

Too early to disclosure
INSTALLATION PERIOD TYPE OF SENSORS NUMBER OF SENSORS
2013 SOFO 22
ImageView of the facility cave at the entrance of testing tunnel
ImageView of the testing tunnel where are located the monitored boreholes
 

Recommended
【网站地图】【sitemap】
【网站地图】【sitemap】